Cadence Design Systems 5fb95a2e039b4

Cadence Design Systems

Cadence is a pivotal leader in electronic design, building upon more than 30 years of computational software expertise.

More Info on Cadence Design Systems

Cadence Design Systems 5fb95a2e039b4

Cadence is a pivotal leader in electronic design, building upon more than 30 years of computational software expertise. The company applies its underlying Intelligent System Design strategy to deliver software, hardware and IP that turn design concepts into reality.

Cadence customers are the world’s most innovative companies, delivering extraordinary electronic products from chips to boards to systems for the most dynamic market applications including consumer, hyperscale computing, 5G communications, automotive, aerospace, industrial and health.

We offer solutions for:

  • Semiconductor and system companies, offering the broadest, most integrated end-to-end solution to help today’s electronic designers do their best work creating tomorrow’s products, for:
  • Silicon design creation, simulation, implementation, and signoff of analog and digital circuits; off-the-shelf design IP; and IC packaging, including machine learning-enhanced EDA tools and machine learning-enabled EDA flows.
  • System design of advanced packaging, safe and secure embedded software, and PCBs; analysis of electromagnetic and electrothermal effects of semiconductors, packages, boards, and systems; and co-optimization with semiconductor devices.
  • Intelligence IP for design of inference processing in edge devices.

Videos

Sponsored
In this QuickChat, Senior Editor David Maliniak sits down with Product Management Director Gary Lytle to discuss Cadence's new Clarity software and the benefits it offers to users...

Resources

3D Solver Speeds System Analysis and Design (.PDF Download)

Articles

Cadence Design Systems
Cadence Joules Rtl Promo
Cadence's Joules RTL Design Studio delivers up to 5X faster register-transfer-level convergence and up to 25% improved QoR through fast, accurate, and early physical insight and...
Jason Hipp, Dreamstime
Cadence Virtuoso Promo
Quicker and more accurate customized analog IC design is the driving force behind Virtuoso Studio.
Software design tools can shave the time and expense of multiple development iterations when striving for a first-round success or when making modifications to improve performance...
Microwaves & RF's newly formed Editorial Advisory Board will give us an additional avenue into gaining industry insights that we can pass along to our audience.
Concerns about power-amplifier heating and operating temps aren’t new as they affect device reliability and performance. However, RF designers must broaden the scope of thermal...
System design teams can quickly and accurately simulate large and complex hyperscale, automotive, mobile, and aerospace and defense systems for EMC/EMI compliance.
Patcharapon Pachasirisakun, Dreamstime.com
Patcharapon Pachasirisakun Xxl 154702623
Expanding 5G/6G connectivity to include network-to-smart device communications, combined with AI and IoT, will usher in a new industrial wave and offer greater business value ...
A workflow that combines measurement-based models with discrete part-value optimization can aid designers by automatically adjusting a design’s component values to optimal manufacturer...
Modelithics now offers over 68 models, representing over 130 individual Mini-Circuits components, that include amplifiers, filters and splitters, among others.
With 5G comes with huge cost and power implications, thus requiring a shift back from FPGA platforms to ASICs. What are the reasons for the move, and how can it be done cost-effectively...

Buyer’s Guide Listing Information

Click here for listing information and directions on how to add or update your company.

Additional content from Cadence Design Systems

Here's this week's selection of some of the most interesting new products that have been launched of late.
Microchip Technology
Microchip Promo
Here's this week's selection of some of the most interesting new products that have been launched of late.
These are a few of the notable new products that grabbed our attention this week.
Cadence's Sherry Hess, chair of the IEEE MTT-S Women in Microwaves subcommittee, discusses her career in the industry and the subcommittee's work to mentor and enhance the profiles...
Here's part 1 of our three-part Media Gallery series on the outstanding product announcements of 2021 as determined by our audience.
Here's this week's sampling of new products that are appearing in the marketplace.
This software suite is intended to accelerate design workflows for applications across the board, ranging from 5G to automotive radar.
As momentum builds for large markets in 5G and radar systems in self-driving vehicles, design engineers rely more and more on the models and simulation capabilities of software...
As the applications extrapolate for wireless devices and interest grows in millimeter-wave frequencies, the RF/microwave industry gathers together with great optimism for the ...
Rohde & Schwarz
The R&S SMA100B
The second-ever edition of this event to be held in the continental U.S. drew in a crowd to its show floor and technical sessions.
Our list includes industry stalwarts in simulation software but also under-the-radar companies with more targeted offerings.
Power-amplifier (PA) designers can take advantage of software that allows them to utilize complex load-pull data sets, thereby streamlining the design process.