6a43fdf93c130080f4c41409 Modelithics

Modelithics

Modelithics, Inc. is the industry leader specializing in RF, microwave and millimeter-wave measurements and measurement-based modeling of RF and microwave components and semiconductor devices.
3802 Spectrum Blvd. Suite 130
Tampa, FL 33612
(813) 866-6335
(888) 359-6359

More Info on Modelithics

Modelithics
6a43fdf93c130080f4c41409 Modelithics

Modelithics, Inc. is the industry leader specializing in RF, microwave and millimeter-wave measurements and measurement-based modeling of RF and microwave components and semiconductor devices. Our software products include libraries of high-accuracy passive and active component models. Modelithics leading product offerings include the Modelithics Complete Library, Modelithics Complete+3D Library , mmWave & 5G Library, and System Components Library™.

Available library models include Microwave Global Models™ for RLC components, non-linear diode models, non-linear and noise models for low, medium, and high power transistors as well as system level component models for functional blocks like filters, attenuators, switches amplifiers and mixers. Modelithics model libraries load conveniently as "model pallets" or design kits within popular Electronic Design Automation (EDA) software tools such as Keysight Technologies’ Advanced Design System (ADS), Keysight Technologies’ Genesys, Cadence® AWR Design Environment® , ANSYS® HFSS™, Sonnet® Suites™, Cadence Spectre RF , and Keysight SystemVue .

Modelithics also offers a broad array of measurement services , including S-parameters, GaN & 3D modeling, noise parameters, pulsed IV, high power RF testing, and source/load-pull. We also specialize in extraction of equivalent circuit and black-box models for linear and non-linear devices that can be inserted into the most popular software tools on the market. The mission of Modelithics, Inc. is to provide exceptionally accurate models and measurements. We help accelerate high frequency product design and serve as a value-added partner to device, instrumentation and design software suppliers.

Modelithics, Inc. was founded in 2001 by Dr. Lawrence Dunleavy and Dr. Thomas Weller, who are known world-wide for their expertise in microwave circuit design, characterization, modeling and electromagnetics.

Articles

dreamstime_heinerle_32711796_2
dreamstime_heinerle_32711796_2
Walk with Jack “Mr. Microwaves” Browne as he roamed the show floor at the recent IEEE International MTT Symposia in Boston.
Software design tools can shave the time and expense of multiple development iterations when striving for a first-round success or when making modifications to improve performance...
An assortment of 3D models for QFN packages enable designers to predict performance for a wide range of scenarios via full-wave 3D EM simulations.
Wideonet | Dreamstime.com
Dreamstime M 97909730
Sometimes you want a whole meal, and sometimes just an appetizer. IMS 2021 aspires to provide the latter with short and snappy MicroApps tech presentations.
Mini-Circuits partners with Modelithics to offer free, full-3D Ansys HFSS models over 40 LTCC filters.
A workflow that combines measurement-based models with discrete part-value optimization can aid designers by automatically adjusting a design’s component values to optimal manufacturer...
Modelithics now offers over 68 models, representing over 130 individual Mini-Circuits components, that include amplifiers, filters and splitters, among others.
Utilizing measurement-based passive-component models within an electromagnetic simulator enables simulations that accurately predict measured performance.
This latest version, which includes 117 new full-wave electromagnetic models, features a large selection of highly scalable models for capacitor, inductor, and resistor families...
As momentum builds for large markets in 5G and radar systems in self-driving vehicles, design engineers rely more and more on the models and simulation capabilities of software...

Buyer’s Guide Listing Information

Click here for listing information and directions on how to add or update your company.

Additional content from Modelithics

These are a few of the notable new products that grabbed our attention this week.
Here's this week's selection of new and popular electronic products in the marketplace.
Here's this week's roundup of some new products that caught our attention; we hope they'll catch yours, too.
In this Day 2 Media Gallery, we continue our coverage of exciting new products debuting at the live portion of IMS taking place in Atlanta.
Copper Mountain Technologies
Copper Mountain Promo
IMS2020 and Microwave Week are nearly upon us, albeit in virtual form due to the public-health crisis imposed by the pandemic. Anxiously awaited each year, IMS is the premier ...
A GaAs MMIC power splitter/combiner...a dc-to-40-GHz SP6T switch matrix...a 3,300-to-3,600-MHz high-efficiency PA—these are some of the latest products making news in the industry...
From amplifiers to passive components to simulation models, check out some of the industry’s latest product offerings.
From the tutorials to the panel session plus other festivities, WAMICON 2019 had something to offer everyone who attended.
Features like internal part libraries and accurate models can greatly benefit anyone tasked with designing filters with discrete elements.
At this year’s WAMICON conference, scheduled for April 8-9 in Cocoa Beach, Fla., the theme will be simulation-driven design.
A new software tool enables engineers to efficiently design circuits with models of actual vendor resistors, inductors, and capacitors, removing the need to manually determine...
As the applications extrapolate for wireless devices and interest grows in millimeter-wave frequencies, the RF/microwave industry gathers together with great optimism for the ...